Raamsdonksveer, Zalmweg 27
North-Brabant, The Netherlands
Location and Accessibility: Optimally Connected and Future-Ready
This sustainable redevelopment is taking place at the Dombosch business park in Raamsdonksveer, strategically located in the municipality of Geertruidenberg, between Oosterhout and Hank. This business park benefits from an excellent location, directly adjacent to the A27 and near the intersection of the A27 (Breda-Utrecht) and A59 (Moerdijk-Oss). The nearest major cities are Breda, Dordrecht, and Tilburg. Its central position ensures outstanding accessibility, which will be further enhanced by the planned expansion of lanes, connecting ramps, and viaducts in 2025 – 2026.
Dombosch offers a dynamic and diverse working environment where small and medium-sized enterprises thrive, with a strong focus on logistics and services. The park is well-connected by public transport, thanks to several bus stops, and also features excellent bicycling infrastructure. With 164.5 hectares, Dombosch is the largest business park in the region, playing both a regional and supra-regional economic role.
Amenities such as walking areas and sports facilities contribute to an attractive and productive working environment. In short: a location that seamlessly combines mobility, sustainability, and work comfort.
Sustainable Redevelopment
This environmentally friendly business location is being developed with the highest possible energy label: A+++++. This project offers a versatile and future-oriented workplace for small and medium-sized enterprises (SMEs) and wholesale companies, with a focus on innovation and efficiency. It features a state-of-the-art building with ample space around it for rainwater infiltration, heat adaptation, and biodiversity. In addition, the location offers an inviting, green outdoor space. Employees and visitors can relax in the beautiful garden next to the office, which not only contributes to a pleasant working environment but also to their well-being.
Integrated Energy System: Sustainable, Reliable, and Future-Ready
Besides grid power this location is also equipped with an advanced integrated energy system that ensures maximum reliability, even in the face of grid congestion, power outages, or geopolitical disruptions of the energy market. Thanks to our innovative approach, energy supply remains both dependable and sustainable.
Green Energy
Our solar panels provide renewable energy to the location throughout the day. Any surplus energy is efficiently stored in our battery energy storage system (BESS). This stored energy can later be used to power the building or the eight charging points for electric vehicles.
Prepared for an Uncertain Energy Future
Grid operators predict an increase in power outages in the near future. This is primarily due to the complexity and large-scale expansions of the electricity grid. Our integrated energy system provides a robust solution:
- Solar panels and BESS: These remain the first line of defense, supplying direct and stored green energy.
- In the event of prolonged power outages, a permanently available HVO100 generator ensures uninterrupted energy supply. HVO100 is fossil-free and CO₂-neutral, aligning with our commitment to sustainability.
Smart Energy Management
Our advanced energy management system seamlessly coordinates a balanced use of four energy sources (solar panels, BESS, grid power, and HVO100 generator). It optimizes energy use to ensure you always benefit from the most sustainable and cost-effective electricity available.
Customized to Your Needs
With an available electrical capacity of 269 kW, our system meets the needs of most customers. Require additional capacity? Our modular design makes expansion simple. We are happy to work with you to provide a tailored solution which matches your operation and sustainability ambintions.
Sustainability, reliability, and flexibility. Our integrated energy system delivers it all!
Building parts in this project4
Floorplan
View floorplanLocation
Zalmweg 27 , 4941 VX Raamsdonksveer, NetherlandsSpecifications
- Current power connection69 – 269kW
- Floor load5T/m²
- Floor flatnessNEN 2747 Class 2
- Free height12,2m
- SprinklerESFR
- Grid12x22,8m
- Loading dock12
- Ground level door2
- Car parking61
Sustainability
- Energy labelA+++++
- BREEAM-NL“Very Good“In-Use
- Heatinggasless “All Electric”
- Solar panels300 kWp (more possible)
- Battery200 kW/400 kWh (more possible)
- HVO100 Generator240 kW
- Generator energyback up only
- Energie information systemnanoGrid
- Energy management systemavailable
- LED-lightingavailable
- Charging points electric vehicles8 (fee based on usage)
- Charging points electric bicycles10
- Covered bicycle parkingavailable
- Green roofavailable
- Green façadeavailable