project

Raamsdonksveer, Zalmweg 27

Available nowNetherlands

North-Brabant, The Netherlands

Location and Accessibility: Optimally Connected and Future-Ready

This sustainable redevelopment is taking place at the Dombosch business park in Raamsdonksveer, strategically located in the municipality of Geertruidenberg, between Oosterhout and Hank. This business park benefits from an excellent location, directly adjacent to the A27 and near the intersection of the A27 (Breda-Utrecht) and A59 (Moerdijk-Oss). The nearest major cities are Breda, Dordrecht, and Tilburg. Its central position ensures outstanding accessibility, which will be further enhanced by the planned expansion of lanes, connecting ramps, and viaducts in 2025 – 2026.

Dombosch offers a dynamic and diverse working environment where small and medium-sized enterprises thrive, with a strong focus on logistics and services. The park is well-connected by public transport, thanks to several bus stops, and also features excellent bicycling infrastructure. With 164.5 hectares, Dombosch is the largest business park in the region, playing both a regional and supra-regional economic role.

Amenities such as walking areas and sports facilities contribute to an attractive and productive working environment. In short: a location that seamlessly combines mobility, sustainability, and work comfort.

Sustainable Redevelopment

This eco-friendly business location is being developed with the highest possible energy label: A+++++. The project offers a versatile and future-oriented workplace for SMEs and wholesale businesses, focusing on innovation and efficiency. The state-of-the-art building is surrounded by areas dedicated to rainwater infiltration, heat adaptation, and biodiversity. Additionally, the site features an inviting, green outdoor space, where employees and visitors can relax in a landscaped garden, enhancing both their well-being and working environment.

Integrated Energy System: Sustainable, Reliable, and Future-Ready

Besides grid power, this location is equipped with an advanced integrated energy system, ensuring maximum reliability even in cases of grid congestion, power outages, or geopolitical disruptions in the energy market. Thanks to our innovative approach, energy supply remains stable and sustainable.

Green Energy

Our solar panels generate renewable energy throughout the day. Any surplus energy is efficiently stored in our battery energy storage system (BESS). This stored energy can later be used to power the building or the eight charging points for electric vehicles.

Prepared for an Uncertain Energy Future

Grid operators predict an increase in power outages in the near future due to the complexity of large-scale electricity grid expansions. Our integrated energy system provides a robust solution:

  • Solar panels and BESS: The first line of defense, supplying both direct and stored green energy.
  • In the event of prolonged power outages, a permanently available HVO100 generator ensures an uninterrupted energy supply. HVO100 is fossil-free and CO₂-neutral, aligning with our commitment to sustainability.

Smart Energy Management

Our advanced energy management system seamlessly coordinates a balanced use of four energy sources (solar panels, BESS, grid power, and HVO100 generator). It optimizes energy use to ensure you always benefit from the most sustainable and cost-effective electricity available.

Customized to Your Needs

With an available electrical capacity of 269 kW, our system meets the needs of most customers. Need additional capacity? Our modular design makes expansion simple. We are happy to work with you to provide a tailored solution that aligns with your business operations and sustainability ambitions.

Sustainability, reliability, and flexibility. Our integrated energy system delivers it all!

Building parts in this project4

Warehouse8,440 m201/10/2025
Office494 m201/10/2025
Mezzanine1,396 m201/10/2025
Car Parking61 spots01/10/2025

Floorplan

View floorplan

Location

Zalmweg 27 , 4941 VX Raamsdonksveer, Netherlands
Download brochureDownload floorplan
Martijn Sleutjes - Profile
Martijn SleutjesBusiness Development ManagerNetherlands+31 765 236 650

Specifications

  • Current power connection69 – 269kW
  • Floor load5T/​m²
  • Floor flatnessNEN 2747 Class 2
  • Free height12,2m
  • SprinklerESFR
  • Grid12x22,8m
  • Loading dock12
  • Ground level door2
  • Car parking61

Sustainability

  • Energy labelA+++++
  • BREEAM-NLVery Good“In-Use
  • Heatinggasless All Electric”
  • Solar panels300 kWp (more possible)
  • Battery200 kW/​400 kWh (more possible)
  • HVO100 Generator240 kW
  • Generator energyback up only
  • Energie information systemnanoGrid
  • Energy management systemavailable
  • LED-lightingavailable
  • Charging points electric vehicles8 (fee based on usage)
  • Charging points electric bicycles10
  • Covered bicycle parkingavailable
  • Green roofavailable
  • Green façadeavailable

Infrastructure & surrounding area

  • Highways
    A27, A59

Media