Barry Callebaut - Green Fleet - Truck Chargers 2024

Electric trucks can charge in two places: at your own depot, or at public chargers along the road. The difference matters because only one of the two is under your control.

In short: depot charging happens at your warehouse, on infrastructure you and your landlord plan and build. En-route charging depends on a public network that is still being rolled out across Europe, on a timeline no fleet operator controls.

That is why most companies serious about electric trucks start with the depot.

Depot charging vs en-route charging at a glance

Depot Charging En-route charging

Where

At your warehouse or distribution centre

At public chargers along motorways

How long trucks stand still

One to eight hours or more, between shifts or overnight

20 to 45 minutes, during the driver’s break

Charging speed

Slow to fast, or megawatt charging at busy sites

Fast to megawatt charging

Who controls it

You and your landlord

Public charging operators

Cost predictability

High, the infrastructure is part of your site

Lower, you pay public prices and depend on availability

Who sets the timeline

You, through your site and lease decisions

National grids and public rollout plans

Why the depot comes first

Public chargers matter for long routes. How quickly they appear, however, depends on each country’s rollout, and no single company can speed that up.

The depot is different. It is a real estate decision, on a site you lease or own, on a timeline you agree with your landlord. It is the one part of charging you can plan, size correctly and keep under control.

3 1 depot vs en route charging

What is megawatt charging (MCS), and do you need it?

The Megawatt Charging System (MCS) is a new charging standard for heavy electric trucks. It delivers around 1 megawatt (1,000 kW), several times more than a regular fast charger. The goal is simple: recharge a truck substantially during the 45-minute break drivers are legally required to take.

Not every depot needs it. Trucks on local or regional routes usually return every evening and stand still overnight, and regular fast charging covers them well.

Megawatt charging becomes relevant when a depot handles long-haul trucks, many truck movements and short stops, where every minute of charging time counts.

3 2 do you need megawatt charging

Worked example: the Einride charging plaza

In Bleiswijk, WDP is building the Netherlands’ first dedicated charging plaza of its kind for Einride, a Swedish company running electric and autonomous freight. It shows what a megawatt-class depot looks like in practice.

  • Six charging points with up to 2,000 kW (2 MW) combined, shared smartly by an energy management system
  • Five points of up to 480 kW each, and one megawatt point on the new MCS standard
  • Room for six electric trucks charging at the same time
  • A 2,250 sq m site with a covered charging area under a wooden roof
  • All charging points due to be ready for testing by the end of October 2026

It is more than a row of chargers. The roof protects the charging area, the driver lounge gives drivers a place to take their break while the truck charges, and the energy management system divides the available power across six trucks instead of reserving it for one.

2 1 einride plaza at a glance

What this means for your fleet electrification plan

Designing a depot for fast or megawatt charging from the start avoids an expensive problem later: rebuilding the site once the fleet outgrows it. Einride​’s plaza and the battery-backed site at Raamsdonksveer show that power and charging can be planned in from day one.

Before choosing a site for a growing electric fleet, ask three questions. How many trucks need to charge at once? How quickly do they need to be back on the road? And can the site’s power supply handle that today, or only after an upgrade?

Frequently Asked Questions

The takeaway

The depot is the part of e‑truck charging you can actually plan and control. Whether it needs regular fast charging or megawatt charging depends on your routes and how quickly trucks must turn around. Getting that right before you sign a lease keeps a growing electric fleet from outgrowing its own depot.

You might also be interested in

Sustainable chocolate delivery: Barry Callebaut’s bold move to e…

Read more
Einride - Charging Hub - WDP Bleiswijk

Einride's charging plaza in Bleiswijk: the Netherlands' first me…

Read more
Raamdonksveer, The Netherlands

Six reasons logistics companies hesitate to go electric, and wha…

Read more
View all articles