Raamdonksveer, The Netherlands

Most hesitation about electric fleets comes down to six concerns: cost, the grid, downtime, technology, expertise and the lease. Each one is legitimate, and each one already has a working answer.

In short: the main objections to fleet electrification are real, but WDP projects with VPD, X2O, Barry Callebaut and Raamsdonksveer show they can be solved without the occupier carrying them alone.

Below, we take them one by one.

7 1 six objections six answers

“It costs too much, and I don’t know when it pays off”

Usually the first concern, and a fair one. Chargers, batteries and site upgrades are real investments, and the payback depends on fleet size, usage and local energy prices. Dirk Van Peteghem, founder of transport company VPD, put it plainly: electric vans and trucks can cost three to four times more than conventional ones, and without support the investment is too heavy to carry alone.

What changes the picture is how you assess and finance it. WDP’s Total Cost of Ownership (TCO) tool maps the full cost of going electric: purchase price, subsidies, insurance, maintenance, diesel versus electricity, and upcoming EU emissions rules.

For X2O, it was decisive. Logistics Director Niels Salembier said the tool gave the company a clear view of the investment and costs over the whole project, and convinced it that the future of trucks is electric.

WDP also financed and built the charging infrastructure as part of the site. The same model made VPD’s switch possible despite the higher upfront cost. See our grid capacity guide for how this fits into wider site planning.

“What if the grid can’t support us in time?”

Often the most justified concern of all. In congested parts of Europe a bigger grid connection can take years, and the timing is out of your hands.

The answer is battery storage. At Raamsdonksveer, the site needed around 200 kW at peak times, but the grid could deliver only 69 kW. A battery, solar panels and an energy management system lifted capacity to 269 kW without waiting for the grid operator. Find out more in battery storage for warehouses.

Chart of the WDP Raamsdonksveer site: a 69 kW grid connection, a 200 kW peak need, and 269 kW available with solar panels and battery storage

“Charging will disrupt our delivery schedule”

This worry usually comes from picturing slow, overnight-only charging that does not fit around multiple shifts. That is a design problem, not a limit of electric trucks.

Barry Callebaut faced exactly this when it electrified transport between its Wieze and Lokeren sites. Wannes van Rysselberghe, Logistics Manager at its Global Distribution Center, summed up the challenge: the trucks are in constant use, with very little time to recharge.

The answer was two 300 kW Alpitronic Hyperchargers, fast enough to keep the operation running 24/7. A depot designed around how the fleet actually works keeps charging from becoming a bottleneck. See depot charging vs en-route charging to judge how fast your depot needs to charge.

“The technology will change and our investment will be outdated”

A reasonable worry, given how fast charging and battery technology are moving. Nobody can promise that today’s equipment will never need updating.

What reduces the risk is building in modules instead of one fixed installation. The Green Mobility Hub WDP built for VPD combines 1.5 MWp of solar panels (their maximum output in full sun), an 800 kW battery and several types of chargers side by side: 17 points at 11 kW, six at 60 kW and two 150 kW hyperchargers for trucks and public use.

Each part can grow on its own as vehicles and technology change. The risk does not disappear, but it shifts from starting over to simply adding on.

7 2 vpd modular energy hub

“We don’t have the in-house expertise”

Grid connections, batteries and chargers are not core business for most logistics companies. It is reasonable not to want to build that knowledge in-house just to electrify a fleet.

This is where a landlord with energy experience makes the difference. WDP designs, finances and delivers this infrastructure through its Green Mobility Hub approach, so you do not have to become an energy specialist. The expertise gap is real, but it does not have to be yours to close.

“Our lease doesn’t allow us to install this”

Often the most frustrating concern, because it is about what the contract allows rather than technology or cost. The fix is to negotiate the right to install or upgrade chargers before you need it. See build-to-suit or existing lease for the clauses worth including, and never assume your landlord will say no without asking.

For WDP tenants, this is less of an issue. WDP supports its tenants’ energy transition directly, with EV charging, solar power and energy storage.

  • Limited financial risk. WDP invests in the chargers and renewable energy itself. Tenants get high-quality infrastructure at competitive prices, with the option to sell surplus energy back to the grid.
  • One partner for everything. WDP coordinates installation, maintenance and administration, linked to the rest of its services, from parking to mobility.
  • Reliable expertise and uptime. A trusted partner network and proactive maintenance keep everything running, backed by knowledge of emissions rules and site safety.

If you are a WDP tenant facing this question, simply raise it with WDP. Your current lease does not have to be a dead end.

Still on the fence?

Every concern above is real, and going electric does not make them vanish. You do not have to solve them alone, though. WDP has already worked through grid constraints, built charging infrastructure and financed it for other tenants, so much of the hard work is done.

You do not need to decide today. Start by asking questions about your grid capacity, a battery, your lease and your site. That is a far easier first step than ruling electrification out.

Frequently Asked Question

The takeaway

Every real objection to fleet electrification, from cost and grid capacity to downtime, technology, expertise and lease terms, already has a working answer, proven at VPD, X2O, Barry Callebaut and Raamsdonksveer. The next step is not a decision. It is a conversation about where your site and your fleet stand today.

You might also be interested in

WDP offers total solution for transport company VPD's mobility s…

Read more

Build-to-suit or existing lease? For an electric fleet, timing d…

Read more
BESS battery

Battery storage for warehouses: charge e-trucks without waiting …

Read more
View all articles